The initial scans of both NCI/MDACC-funded "QIBA DCE-MRI Phantoms" were completed on 02/15/2009. Other than assembly differences, there were no significant differences between the phantoms (based on IR T1 measurements of the filling solutions of the 8 spheres).

For the 02/15/2009 scans, some changes to the originally proposed acquisition protocol were made and are shown in red in the PDF file below:

File:MDACC QIBA Scans 20090215 Acq Params.pdf