Difference between revisions of "Publication Process"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
** provide RSNA Staff with the [[QIBA_Profile_Stages#Stage_2:_Consensus|Support Document]] (Excel, Google Sheet, etc) | ** provide RSNA Staff with the [[QIBA_Profile_Stages#Stage_2:_Consensus|Support Document]] (Excel, Google Sheet, etc) | ||
*** there is no support document required to publish for the Public Comment Stage | *** there is no support document required to publish for the Public Comment Stage | ||
+ | |||
+ | |||
* ''RSNA Staff'' | * ''RSNA Staff'' | ||
** checks the minutes of the Biomarker and Coordinating Committees to confirm the approval results | ** checks the minutes of the Biomarker and Coordinating Committees to confirm the approval results |
Revision as of 20:24, 7 July 2020
When a profile has been reviewed and approved for publication
- Authors
- inform RSNA Staff that a profile is ready for publication
- provide RSNA Staff with the Word document of the profile
- provide RSNA Staff with the Support Document (Excel, Google Sheet, etc)
- there is no support document required to publish for the Public Comment Stage
- RSNA Staff
- checks the minutes of the Biomarker and Coordinating Committees to confirm the approval results
- generates a PDF of the Profile document provided by the authors
- uploads the PDF document to the Wiki (Tip: Upload file)
- adds a link to the Profiles page in the appropriate stage (Tip: copy an existing link to get the format)
- removes the old link for this profile in the prior stage
- may mirror published Profiles on qiba.rsna.org to increase availability
- links to the Support Document from the corresponding row in the Comment Resolutions page
- Authors may also want to publicize the profile by:
- drafting an executive summary paper for submission to a relevant journal
- submitting a letter to the editor of a relevant journal
- notifying trade news such as Aunt Minnie
- posting to mailing lists of relevant professional societies or interest groups